Clients

Arabian Cement Company

Services

Automatic Power Factor Correction Systems

Location

Rabigh – Saudi Arabia

Arabian Cement Factory is supplied with electrical power by local power generation station. the generated high voltage (6600 V) is supplied to sub-transformers to convert it to
440 V. The aim of this project was connections of automatic power factor correction systems on low voltage side at seven different locations:

  • Crushers
  • cement mills
  • packing plant
  • power plant
  • oil treatment station
  • clinker silo

The total KVAR been connected is 2,550 kVAR